We were excited to be awarded this project after a competitive tender process, working with a new client and their contract administration team. The aim was to carry out end-of-lease dilapidations on an industrial unit in Tunbridge Wells and prepare the space for lease after the previous tenant moved out.

The Brief
The works involved stripping out tenant-installed fixtures and fittings, followed by internal and external repairs, including decorating throughout. New floor finishes were installed, and any issues with power, data, and lighting systems were addressed based on the faults identified in the EICR.
For the roofing, we replaced defective rooflights, applied cut-edge protection treatments, and jet-washed and overcoated the roof with a Liquasil Metal Seal system, which comes with a 25-year warranty. We also lined the existing gutters with a Liquasil Gutter Seal system to ensure the building was ready for its new occupier.

The Works
Strip-out of tenant-installed fixtures and fittings
Internal and external repairs and decoration throughout
Installation of new floor finishes
Power, data, and lighting system upgrades as required
Replacement of defective rooflights and application of cut-edge protection
Roof jet-washing and overcoating with Liquasil Metal Seal system
Lining of existing gutters with Liquasil Gutter Seal system

Outcome
The completed works successfully prepared the industrial unit for its next lease, ensuring a safe, functional, and visually refreshed environment. The combination of thorough internal and external refurbishment, upgrades to key systems, and long-lasting roofing solutions delivered a high-quality space ready for a new occupier.

Enhancing Performance and Longevity
The refurbishment was designed not only to improve aesthetics but also to enhance the building’s performance and durability. By addressing structural repairs, upgrading mechanical and electrical systems, and applying high-quality roofing and gutter solutions, the project extended the life of the industrial unit while reducing future maintenance needs. This proactive approach ensures a reliable, efficient, and low-maintenance environment for the incoming tenant.